Working with CRS (Critical Room Solutions) and DPS (Digital Place Solutions) we had had a dedicated team working over 2 months to install the large 33m LED screen into the new Rail Operations Centre in Alexandria, NSW.
It was a fantastic opportunity to work on the new state of art Operations Centre.
https://www.smh.com.au/national/nsw/bigger-and-better-than-nasa-300m-rail-control-centre-opened-20190530-p51sne.html
http://www.inavateapac.com/news/article/sydney-trains-rail-operation-centre-employs-nanolumens-command-and-control-led-display